Skip to main content

Project-R Home Renovation, Brampton

Initially we started this project at this (30 years or so old house) with the main floor renovations that included a full design & build of an extended new kitchen along with the removal of a half wall and two decorative posts, new hardwood flooring, a fully renovated powder room (with a floating vanity), a laundry room, re-stain steps wirh new metal spindkes, potlights throughout and painting of-course(Benjamin Moore OC-20)!

The homeowners upon seeon our quality of work added both second floor washrooms to the project.

And eventually the front entry doir and the rear patio doors as well, which were ordered lastcweek and will becinstalked bybthe end of next week!!